Skip to content

Data center cabling. Built for live halls.

Structured cabling, fiber backbone, rack and stack, and L1-L2 commissioning support, with carrier-grade documentation and the change-window discipline live data halls require.

01  /  Overview

Cabling through commissioning. The same crews.

One contractor from structured cabling through commissioning, working to the change windows mission-critical facilities require.

In a live hall

Data center mistakes surface during an audit or an incident, not during construction.

A missed labeling step, a bend-radius shortcut, a witnessed test that nobody actually witnessed: each one shows up later. HexTel works to BICSI-aligned standards, captures test data per drop and per trunk, and assembles closeout packets the owner's Cx team can sign without rework.

In live halls, each cutover or energization runs under an MOP with owner sign-off, a backout plan and an after-hours window when required. The crews that mobilize for structured cabling stay through commissioning, so no second contractor has to work out what the first one built.

New to the Cx process? Read Level 1-5 commissioning in plain English: what each level covers, from FAT through integrated systems testing.

02  /  What we do

Four scopes. One accountable team.

Structured cabling, fiber backbone, rack and stack, and L1-L2 commissioning support.

Structured cabling

Copper and fiber structured cabling to BICSI-aligned designs: Cat6A, Cat7 and Cat8 copper alongside OS2, OM4 and OM5 fiber, with labeling discipline and permanent-link and channel test reports for closeout.

  • BICSI-aligned design support, with the owner's consultant where one is in play
  • Color-coded labeling and as-built records to the owner's standard
  • Permanent-link and channel test reports for each drop, archived to standard
  • Pathways: ladder rack, basket tray, underfloor and overhead routing

Fiber backbone

MMR-to-data-hall fiber trunks and high-density terminations: MPO and LC terminations, bidirectional OTDR and insertion-loss test packets, and routing that respects hot-aisle and cold-aisle design.

  • MPO-12, MPO-24 and MPO-48 trunk deployment with breakout cassettes
  • Bidirectional OTDR and IL/RL reports with end-to-end channel tests
  • Hot-aisle and cold-aisle compliant routing per the owner's thermal design
  • Patch panel and cross-connect terminations with labeled port maps

Rack and stack

From cabinet receipt and inventory through server and switch mounting, cable management, smart-PDU mapping and supervised power-up.

  • Cabinet receipt, inventory and serial capture against the owner's asset register
  • Server, switch and storage mounting to rack design and weight standards
  • Vertical and horizontal cable management with bend-radius discipline
  • Smart-PDU mapping, labeling and supervised power-up handoff

L1-L2 commissioning support

Cabling QA, witnessed FAT and SAT attendance, punch resolution, and closeout packages with test data, as-builts and owner handoff records, in coordination with the owner's commissioning authority.

  • L1-L2 scope aligned with the owner's Cx authority and plan
  • Witnessed factory and site acceptance test attendance and documentation
  • Punch list resolution coordinated with the general contractor and MEP trades
  • Closeout packets: test data, as-builts, training records, owner handoff

03  /  How we work

Tested, labeled, signed off.

The standards and controls a live data hall runs on, set before crews mobilize.

Cabling standard
BICSI-aligned, with permanent-link and channel test reports
Fiber records
Bidirectional OTDR and IL/RL reports per trunk
Live-hall changes
MOPs with owner sign-off and backout plans
Commissioning
L1-L2 support with witnessed test attendance
Procurement
Mutual NDA and COI package, released on request
Coverage
Crews in multiple states, mobilizing nationwide

04  /  Proof

Data hall, MMR and edge sites.

Structured cabling, fiber backbone and commissioning work for enterprise and integrator clients, scoped from cabling through L1-L2 commissioning support.

  • MMR fit-outs
  • Structured cabling refresh programs
  • Rack-and-stack waves for capacity expansions

Program metrics, rack counts and termination volumes are shared under NDA during scoping.

05  /  Questions

Common questions on data center work.

Do you coordinate with the MEP and commissioning authority?
Yes. We work under the owner's Cx authority and MEP scopes, attend witnessed tests, and route punch resolution through the GC. Closeout packets are assembled to the standard the owner's Cx team requires.
How do you handle change-window discipline?
Each cutover, energization or live-system change is planned to a method of procedure (MOP) with owner sign-off, a backout plan and a communication tree. After-hours and weekend windows are part of standard mobilization for live data halls.
Do crews have NDA and security clearances?
NDA and clearance requirements differ by customer. Crews sign the customer's NDA, and where a site has clearance requirements we coordinate clearance and badging timelines during scoping, so the program is not blocked at access.
What insurance, COI, and procurement artifacts can you provide?
A standard procurement package: mutual NDA, MSA, DPA, a certificate of insurance naming the owner, and W-9, released on request. Carrier-specific procurement documents are also available on request during scoping.
What regions do you serve for data center work?
Crews work in multiple states and mobilize nationwide. Where a project needs a state GC license HexTel does not hold yet, we obtain it before work starts; depending on the state and demand, that takes 2 to 6 months.

Next step

Scoping a data center build?

Send the scope, or book a 30-minute scoping call on your environment, change windows and Cx process. We reply within one business day.