
HexTel self-performs wireless, fiber and outside plant, data center cabling, public safety, and EV and power, including crane and helicopter hard-access sites.
Mission-critical infrastructure / Dallas, Texas
Infrastructure the country runs on.
- 0.96EMR
- ZeroOSHA recordables
- 1,000+Projects completed
- NationwideCrews in multiple states
01 / Mission
Build and close out telecom and power infrastructure safely, so people and businesses can stay connected and keep working.

02 / Who we are
Built by tower foremen. Scaled into a nationwide force.
HexTel was founded by tower foremen who spent years on structures before they ever sat behind a desk. Every team member, including management, carries real construction experience.
Since 2020
Started as one owner-operator crew building telecom networks across Texas.
That origin still defines how we run: crews mobilize with safety controls in place, quality checkpoints stay consistent, and closeout is captured as the build happens.
The safety work happens before anyone leaves the ground.
Safety before schedule
EMR 0.96 and zero OSHA recordables in every year of operation.
Own the work
In-house crews across five divisions, and one HexTel team accountable from mobilization to closeout.
Closeout counts
Photos, test results and as-builts are captured as the work happens, not assembled afterwards.
Led from the field
HexTel was founded in 2020 by tower foremen.
Stay responsive
We reply to project inquiries within one business day.
03 / The record
Our safety record and program relationships, each under its own label. Supporting documents are released on request.
0.96
EMR
From the insurer-issued EMR letter that ships with the packet. 1.00 is the industry baseline.
Zero
OSHA recordables
In every year of operation. OSHA 300A logs go to prequalification reviewers.
1,000+
Projects completed
Built, tested and documented through acceptance.
No. 27
2026 Inc. 5000, telecommunications
Founded in 2020 by tower foremen.
1,000+ projects completed
One mark per project
- Carrier experience
- Major U.S. carriers, plus rural and regional carriers
- Approved vendor
- Major tower owners and most private tower owners
- Master service agreements, primes
- Major national primes
- Master service agreements, OEMs
- Major network equipment OEMs
- Prime experience
- Programs delivered as prime contractor
- Certified partner
- Tesla Energy, EV charging and battery storage
- Credentials
- Licensed general contractor, license numbers on request. 2026 Inc. 5000, No. 27 in telecommunications.
- Electrical scope
- Licensed electrical qualifiers pull permits under HexTel's name.
- Safety program
- Aligned with ANSI/ASSP A10.48-2023. NWSA-certified climbers.
- OSHA 300A logs
- On file for every year of operation.
Programs delivered for
04 / Divisions
Five divisions. One accountable team.
Each division self-performs its scope and delivers a documented closeout.
AT&T builds and T-Mobile North Texas sitesWireless
Macro towers, small cell and DAS, and site integration through sweep, PIM and carrier acceptance, including crane and helicopter hard-access sites.Macro · Small cell · DASSweep · PIM · Carrier acceptanceCrane and helicopter access
Build, splice and test under one crewFiber & OSP
Aerial and underground construction, directional boring, fusion splicing and OTDR testing, closed out by the same crews.Aerial · UndergroundDirectional boringFusion splicing · OTDRCabling through L1-L2 commissioningData Centers
Structured cabling in Cat6A/7/8 and OS2/OM4/OM5 to BICSI, MMR-to-hall fiber backbone, rack and stack, and L1-L2 commissioning support.Cat6A/7/8 · OS2/OM4/OM5BICSI · MMR-to-hall backboneRack and stack · L1-L2 support
AHJ-ready closeout packetsPublic Safety
ERRCS and BDA systems on UL 2524 equipment, IFC 510 grid testing, fire-alarm integration and annual recertification.ERRCS · BDA · UL 2524IFC 510 grid testing · Fire alarmAnnual recertification
Tesla Energy certified partnerEV & Power
EV fast charging, solar PV, battery storage and 200A+ electrical service, delivered as a Tesla Energy certified partner.EV fast chargingSolar PV · Battery storage200A+ electrical service05 / Process
From scope to acceptance in four steps.
Step 01
Scope and prequalify
Scope, state, site count and start window in; a reply within one business day, with the COI, W-9 and prequalification packet on request.
Step 02
Mobilize
Crews, rigging, rescue plan and permits staged before the first climb; access and utility dependencies confirmed.
Step 03
Build and integrate
Structure, antenna and line work, fiber and power, then sweep, PIM and commissioning by HexTel crews.
Step 04
Close out and accept
Photos, tests, labeling, grounding evidence and as-builts captured as the work happens, delivered as a carrier-ready packet.
06 / Coverage
At work across the United States.
Crews are active in multiple states today, and we mobilize nationwide for new programs.
Active today
Scope
NSBs, MCA upgrades, anchor sites, integration
Active todayOpen to new programsDallas, Texas headquarters

07 / Work delivered
Work delivered.
One project case study and two carrier programs. Program figures cover many sites, not a single project.
Case study, public safety wirelessAmentum | Public-Safety Wireless Deployment at ScalePublic-safety wireless and cell-tower deployments across the South, Southwest and Midwest. Network integration closed out against carrier acceptance standards.Read the case studyAT&T
600+
builds, including 400+ on the T6 build
Wireless program experience: tower work and site integration through sweep, PIM and carrier acceptance.
T-Mobile
400+
North Texas sites across HexTel programs
Wireless program experience across North Texas, with acceptance-ready closeout packages.
09 / Contact
Need crews for an upcoming program?
Send the scope, the state and the site count. We reply within one business day; the COI, W-9 and prequalification packet follow on request.
- Phone
- (945) 266-4209
- bids@hextel.com
- Headquarters
- 3635 Conflans Rd, Irving, TX 75061
- Reply
- Within one business day
Prefer to talk? Request a call.
- How fast can you mobilize?
- It follows the program's access and permit schedule; crews and timing are confirmed on the first call.
- What do you need from us to send the packet?
- Your name, work email and company. Licenses, COI, bonding letter, W-9 and identifiers go to the procurement contact you name.
- Can I send drawings or a site list?
- Paste a link in the scope form, or email bids@hextel.com with the reference you get after sending.