Skip to content
Lattice tower with microwave dish antennas and an equipment shelter on a wooded hilltop.

Case study  /  Public Safety Wireless

Amentum | Public-Safety Wireless Deployment at Scale

Public-safety wireless and cell-tower sites across the South, Southwest and Midwest, closed out to carrier acceptance standards.

01  /  At a glance

The program at a glance.

Client context, scope and delivery structure in one place.

Client
Amentum
Region
South, Southwest, Midwest (BEAD-qualified regions)
Scope
Public-safety wireless and cell-tower deployments
What we delivered
End-to-end telecom and cell-tower execution, fiber backhaul and power integration, permitting and utility coordination, signal testing and post-install certification
Delivery cadence
~2 weeks average turnaround per site

02  /  The mission

What had to be solved.

The field problem, and why it mattered to the program.

Expand public-safety coverage quickly while keeping strict acceptance standards and repeatable build quality across a broad footprint.

03  /  Execution

How HexTel did the work.

Field actions, control points and the coordination model used to deliver.

  • End-to-end telecom and cell-tower deployment workflow
  • Backhaul and power readiness aligned to carrier standards
  • Permitting and utility coordination to protect schedules
  • Final signal testing and certification for handoff

04  /  Results

Measured outcomes.

The results and the evidence behind them.

  • ~2 weeksaverage turnaround per site

Result highlights

  • ~2 weeks average turnaround per site
  • Network integration closed out against carrier acceptance standards

Evidence overview

Previews of the evidence documents tied to this deployment.

Next step

Need crews for a similar program?

Send the scope, the state, the site count and the start window. We reply within one business day.

Prefer to talk? Request a call.