EV charging. From make-ready to commissioning.
Level 2 arrays, DC fast charging, utility coordination and fleet depots, built under the same closeout discipline as our telecom and clean-energy work. HexTel is a Tesla Energy certified partner.
01 / Overview
Construction is the hard half.
Equipment is one part of the job. Make-ready, interconnection and commissioning also require planning.
Where projects stall
Most EV charging delays are not about the charger.
They come from utility interconnection queues, service upgrades, trenching surprises and closeout documentation the program reviewer will not accept. HexTel approaches charging as infrastructure construction, with the same permitting, civil, electrical and evidence discipline it runs on telecom builds.
HexTel is a Tesla Energy certified partner. Our crews handle Wall Connector and Supercharger installations, and the clean-energy practice pairs charging with Powerwall storage and site power upgrades where the site needs them.
EV charging is one part of the EV & Power division. See the EV & Power page for solar PV, battery storage and site power, or go straight to what that division does.
02 / What we do
Five scopes. One crew model.
Charging, make-ready, Tesla partner installs, fleet depots and public builds.
Level 2 and DC fast charging
Commercial multi-port Level 2 arrays and DC fast-charging sites built end to end: conduit and pedestal construction, equipment setting, terminations, and commissioning evidence for the owner's handoff.
- Level 2 commercial multi-port arrays for workplaces, retail and multifamily
- DC fast-charging construction including switchgear and equipment pads
- Conduit, trenching and pedestal civil work handled in scope
- Commissioning and closeout documentation packaged for owner handoff
Utility coordination and make-ready
The utility side is where EV projects stall. We coordinate interconnection applications, service upgrades, and transformer and metering work with the utility, so construction is not waiting on paperwork.
- Utility interconnection application coordination and follow-through
- Service upgrades and distribution work to support new charging loads
- Transformer, metering and easement coordination with the utility
- Load calculations and site power documentation for the AHJ
Tesla partner installs
Wall Connector and Supercharger site installations as a Tesla Energy certified partner, with Powerwall integration where the site pairs charging with storage: the same partnership the clean-energy practice runs on.
- Tesla Wall Connector and Supercharger site installations, as a Tesla Energy certified partner
- Powerwall pairing where charging combines with battery storage
- Tesla's installation and documentation standards followed end to end
- Crews shared with the clean-energy practice
Fleet depots
Fleet depots cannot stop running while they electrify. Charging construction is phased around vehicle schedules: circuits energized in stages, lanes kept clear, operations consulted at each phase gate.
- Phased construction sequenced around active fleet schedules
- Staged energization so completed positions charge while others build
- Load management and future-expansion conduit planned into the build
- Depot operations coordination at each phase gate
Public and funded programs
Publicly funded charging programs are judged on documentation: uptime requirements, accessibility, signage and evidence packages. We build to the program standard from the start, so closeout is not a scramble.
- Construction documentation aligned to public-program requirements
- ADA accessibility and signage requirements built into the layout
- Commissioning evidence packages formatted for program review
- Coordination with site hosts and program administrators
03 / Proof
Certified partner. Texas and New Mexico first.
Charging, battery storage and site power under one crew model, alongside an active multi-state telecom construction operation.
- Certification
- Tesla Energy certified partner, EV charging and battery storage
- Initial regions
- Deployment-ready across Texas and New Mexico
- Sites
- Workplace, retail, multifamily, depot and public sites
- Make-ready
- Utility make-ready and interconnection coordination in scope
- Closeout
- Commissioning evidence packaged for owner and program review
- References
- Certification details and references released on request
04 / Questions
Common questions on EV charging work.
- Who handles the utility interconnection, HexTel or the owner?
- Either model works. We can run the interconnection application and utility coordination as part of the scope, or work under an application the owner has already filed. What matters is that construction sequencing and the utility timeline are managed by one accountable party, settled in scoping.
- What does the Tesla Energy partnership cover on EV charging work?
- As a Tesla Energy certified partner, HexTel installs Tesla charging hardware and pairs Powerwall storage where a site combines charging with backup, following Tesla's installation and documentation standards end to end.
- Can you install chargers at a depot without stopping fleet operations?
- Yes, that is the normal case. Construction is phased around vehicle schedules, circuits are energized in stages so completed positions start charging while the rest build out, and depot operations are consulted at each phase gate.
- Are electrical service upgrades part of your scope?
- Yes. New charging loads usually need service work: 200A+ upgrades, distribution reconfiguration, transformer coordination. The same crews that handle site power on our clean-energy builds run that scope; see the site power capability on the EV & Power page.
- Do you build to public-funding program requirements?
- We build public charging sites to the documentation, accessibility and commissioning-evidence standards these programs require, and coordinate with the program administrator's review process as part of closeout.
- How does EV charging connect to your clean-energy work?
- EV charging is one part of the EV & Power division: charging, solar PV, battery storage and site power share the same crews and closeout discipline. See the EV & Power page for the full scope.
Next step
Scoping a charging build?
Send the site plan or the problem statement, or book a 30-minute scoping call on your site, utility and equipment. We reply within one business day.