ERRCS walk test. Grid by grid, floor by floor.
The in-building public-safety signal survey required by NFPA 1225 and the IFC. Readings taken point by point on a grid through every floor drive BDA design and AHJ sign-off.
01 / Definition
The short answer
An ERRCS walk test validates that a building has adequate public-safety radio coverage. The technician walks a defined grid through every floor with a calibrated receiver, recording signal strength and audio quality at each grid point. The pass/fail thresholds come from NFPA 1225 or IFC Section 510/1103, adjusted by the local AHJ.
02 / How it runs
Field practice
A standard walk test takes 1 to 3 days depending on building size, uses a calibrated public-safety-band receiver, and records signal level and DAQ at every grid point plus full coverage of critical areas. The deliverable is a coverage heatmap, a measurement log, and a compliance summary scoped to the AHJ's acceptance template.
03 / FAQ
Common questions about ERRCS walk tests
- What is an ERRCS walk test?
- ERRCS (Emergency Responder Radio Communication System) walk test is the in-building public-safety signal survey that validates a building's public-safety radio coverage. The technician walks a grid through every floor with a calibrated receiver, recording signal level and audio quality (DAQ: Delivered Audio Quality) at each point, against thresholds set by NFPA 1225 or IFC Section 510 / 1103.
- What thresholds does the walk test measure against?
- Grid layout, coverage thresholds and required delivered audio quality follow the adopted code edition and the AHJ's approved test plan. The AHJ (Authority Having Jurisdiction) sets the specific dBm and DAQ thresholds for their jurisdiction.
- What is the grid spacing?
- Grid layout, coverage thresholds and required delivered audio quality follow the adopted code edition and the AHJ's approved test plan. Critical areas (stairwells, elevators, fire command room, exit routes) are covered per that plan regardless of grid pattern.
- What is DAQ 3.0?
- Delivered Audio Quality is a 1 to 5 subjective scale defined in TSB-88. DAQ 3.0 means 'Speech understandable with slight effort; occasional repetition required due to noise/distortion.' The required DAQ follows the adopted code edition and the AHJ's approved test plan.
- When is the walk test performed?
- Three windows: (1) pre-design baseline, to determine whether a BDA is needed at all; (2) post-install acceptance, to validate the BDA system meets code before AHJ sign-off; (3) annual recertification, to confirm continued compliance. Some jurisdictions require quarterly battery checks plus the annual walk test.
- Does HexTel perform ERRCS walk tests?
- Yes. Walk-test, BDA install, and ongoing AHJ acceptance support is part of HexTel's wireless/in-building scope. See /glossary/das-vs-bda for the DAS vs BDA distinction, and /services/wireless for the full in-building scope.