Case study / Network Operations
T-Mobile | Network Expansion and High-Availability Connectivity
Connectivity upgrades across key sites, delivered with acceptance-ready closeout.
01 / At a glance
The program at a glance.
Client context, scope and delivery structure in one place.
- Carrier
- T-Mobile
- Region
- Texas
- Scope
- Telecom and cell-tower expansion and upgrades, including DAS and fiber work
- What we delivered
- Cell-tower and rooftop installs, high-capacity fiber pull and termination, planning for future public-safety and 5G compatibility
- Delivery cadence
- Set by the program's rollout windows
02 / The mission
What had to be solved.
The field problem, and why it mattered to the program.
Expand and harden connectivity across key sites while supporting continuous operations and high availability.
03 / Execution
How HexTel did the work.
Field actions, control points and the coordination model used to deliver.
- Cell-tower and in-building coverage installation where service quality mattered most
- High-capacity fiber deployment and terminations for throughput and reliability
- Schedule-driven support to keep rollout windows moving and reduce downtime risk
04 / Results
Measured outcomes.
The results and the evidence behind them.
- 400+T-Mobile North Texas sites across HexTel programs
Result highlights
- Acceptance-ready closeout package delivered
Evidence overview
Previews of the evidence documents tied to this deployment.